“A company specialized in the construction and maintenance of pipelines for collection,
transport and integration of hydrocarbons.”

PIPELINES

In the construction of pipelines and operation infrastructure of hydrocarbon transport systems.

Activities aimed at the completion of a construction project in accordance with the requirements established by the customer, in the project’s APC engineering to transport hydrocarbons from a drilling site, separation batteries or service drill site, to the point of sale.

The construction of a pipeline requires the completion of the processes ranging from environmental permits, risky jobs permits, permission to access premises up to pipeline construction site, supply of materials and accessories, pipe welding, excavation, lowering and covering, leakage tests, and strict compliance with current regulations ASME / ANSI B.31.8, ASME / ANSI B.31.4, ASME / ANSI B31.3, API-1104, API-5L, ISO 3183-3 L360 (HA), NRF-030-2009, NRF-096-2010, ASTM-A-694, ASTM-234 NACE MR-01-75, to guarantee the duct quality as it matters to its functionality and service.

It is guaranteed that all construction processes comply with the quality and acceptance required by the customer, under regulations ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007.

ESR
CERTIFIED COMPANY
OHSAS 18001:2007 - PERRY JOHNSON
ISO 9001:2008 / ANAB -PERRY JOHNSON - UKAS
ISO 14001:2004 / ANAB -PERRY JOHNSON - UKAS
ANAB
CONSTRUCCIONES Y ARRENDAMIENTOS INDUSTRIALES S.A. DE C.V.
INFORMATION: + (52) 833-228-7700
info@caisa.net
SUBSCRIBE TO OUR NEWSLETTER